ON OPERATION OF 740 M LONG FREIGHT TRAINS ON CZECH TEN-T RAILWAY NETWORK
DOI:
https://doi.org/10.14311/APP.2016.5.0012Abstract
Regulation (EU) No 1315/2013 defines actual scope of core and comprehensive TEN-T network, including both networks for railway freight transport. For the core network, possibility to operate 740 m long freight trains is required. The aim of this paper is to analyse availability of appropriate overtaking tracks for 740 m long freight trains. Due to ETCS braking curves and odometry, such trains, after ETCS implementation, will require 780-800 m long overtaking tracks. For practical reasons (e.g. bypass lines), whole Czech railway TEN-T network is analysed. The overtaking track, whose occupation means influence on scheduled traffic or threat to boarding passengers, are excluded. The data was collected from station schemes from Collection of Official Requisites for 2015/16 Timetable, issued by SŽDC, Czech state Infrastructure Manager. Most of appropriate tracks are over 800 m long, but their density in the network and in particular directions varies considerably. For freight traffic, gradient of the line is important, so in the resulting figure, there are marked significant peaks for particular lines as well. Czech TEN-T lines are further segmented on the basis of number of tracks and their traffic character. Then, specific issues on overtaking or crossing of 740 m long freight trains are discussed. As a conclusion, for long-term development of Czech TEN-T lines, targeted investment is recommended not only for passenger railway, but also for freight railway. An attractive capacity offer for railway undertakings, which can stimulate freight traffic on European Rail freight corridors, can be represented by network-bound periodic freight train paths with suitable long overtaking tracks outside bottlenecks. After the overtaking by passenger trains, a freight train should run without stop through large node station or a bottleneck area. Before the sections with high gradients, coupling of additional locomotives should be connected with the overtaking process. Next suitable overtaking tracks should be available behind every significant peak of the line.Downloads
Published
Issue
Section
License
Copyright notice
Authors who publish with this journal agree to the following terms:
1. Authors retain copyright and grant the journal the right of the first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
2. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., to post it to an institutional repository or to publish it in a book), with an acknowledgement of its initial publication in this journal.
3. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges as well as earlier and greater citation of the published work (See The Effect of Open Access).