3D Modelling of a Tunnel Re-excavation in Soft Ground
DOI:
https://doi.org/10.14311/1378Keywords:
tunnel, clay, soft ground tunnelling, sprayed concrete, New Austrian Tunnelling Method, NATM, Sprayed Concrete Lining, SCL, numerical modellingAbstract
The construction of the shallow tunnel at Brezno started using the Pre-Vault Method. The tunnel excavation, in complicated geological conditions, led to many difficulties which finally resulted in a collapse, when a significant part of the temporary tunnel lining collapsed. Various options for re-excavating the tunnel were evaluated prior to further construction. Finally a decision was made to separate the collapsed area into sections 9 m in length using 16 m-wide, transversally oriented pile walls, to improve the stability of the collapsed ground. The walls were constructed from the surface prior to excavation. It was also decided to re-excavate a collapsed area using the Sprayed Concrete Lining (SCL) method. Due to problematic soft ground conditions, which had been made even worse by the collapse, some additional support measures had to be considered prior to re-excavation (ground improvement, micropile umbrellas embedded into the pile walls, etc.)This paper describes numerical modelling of the tunnel re-excavation through the collapsed area. Initial calculations of the tunnel re-excavation were made using a 2D finite element method. Subsequently, further calculations to evaluate the rock mass behaviour in the collapsed area were provided in 3D. The 2D calculations were used to provide sensitivity studies, while 3D modelling was mainly used for evaluating the tunnel face stability (impact of the pile walls, impact of ground improvement) together with other factors (length of advances, moment of the temporary invert closure, etc.) The results of the modelling were compared with the monitoring results.The paper also briefly describes the construction experience (technical problems, performance of various support measures, etc.) The excavation and the primary lining construction were completed in 2006, and the tunnel was opened for traffic in April 2007.Downloads
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:
1. Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
2. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
3. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).
4. ddd