Dynamic Simulations in Cost and Time Estimation of the Construction Process
DOI:
https://doi.org/10.14311/935Keywords:
simulation, time scheduling, cost scheduling, reliability and riskAbstract
This paper describes a model which is able to simulate the costs and the duration of construction for a building project. The model predicts the set of expected costs and the duration of the project depending on input parameters such as production rate, scope of the work, the time schedule, bonding conditions, maximum and minimum deviations from the scope of the work, and the production rate. Clients are able to make proper decisions concerning the time and cost schedules of their investments.Downloads
Downloads
Published
Issue
Section
License
Authors who publish with this journal agree to the following terms:
1. Authors retain copyright and grant the journal right of first publication with the work simultaneously licensed under a Creative Commons Attribution License that allows others to share the work with an acknowledgement of the work's authorship and initial publication in this journal.
2. Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgement of its initial publication in this journal.
3. Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work (See The Effect of Open Access).
4. ddd